Weekly report of Hulubalang Gold Mining Project in Indonesia(2) 2020-12-01

Basic information of Hulubalang Gold Project:

Scope of mineral rights:38.36Km2.

Mineral right type: Large gold mine.

Metal type: gold and polymetallic ores.

Location:Hulubalang Village, Paleleh Town, Central Sulawesi Province.

Project stage:Preparation period of mine construction.Infrastructure,such as surface plant,explosive magazine, dormitories and roads, has been completed.

Geological exploration is the foundation of the whole mining process. In geological exploration work, early preparation not only needs to spend a lot of time, but also needs to be patient and careful enough to pay attention to every detail of the mine.



01

Field reconnaissance: a double test of stamina and endurance

HOT Pirates never stops moving, they travelled through the rainforests, collecting ore samples and visiting the mining locations. They worked from dawn to dusk, They endured the heat and humidity and mosquito infestation in the rain forest. In order to understand the real situation of the mine, they constantly collected data, calculated the reserves and grade of real resources, to provide accurate and detailed data support for the analysis of mining conditions.




02

 Mine due diligence: Work steadily

After field reconnaissance, engineers will conduct a comprehensive analysis and study of the data collected on site. According to the mine project due diligence list, the geology of the mine/deposit, the drilling and trenching work like exploration method and quality control shall be cleared, including core rate,drilling survey,borehole diameter and the exploration work scope. Also to get clear the sampling, samples preparation process, test method, internal and external inspection and error statistical analysis work.



LATEST NEWS