Weekly report of Hulubalang Gold Mining Project in Indonesia(6) 2021-01-20
Basic information of Hulubalang Gold Project:
Scope of mineral rights:38.36Km2.
Mineral right type: Large gold mine.
Metal type: gold and polymetallic ores.
Location:Hulubalang Village, Paleleh Town, Central Sulawesi Province.
Project stage:Preparation period of mine construction.Infrastructure,such as surface plant,explosive magazine, dormitories and roads, has been completed.
It's time for the weekly report again. Let's see what HOT Pirates have done at the site of Hulubalang Gold Mine last week!
The heavy rain in the rainforest always falls without any predict. During the rain break, we completed the survey of the farthest and highest drill hole above no.3 orebody and verified thecoordinates of the drill hole. A total of 12 boreholes and 8 newly discoveredunauthorized and wasteful mining sites were verified. A Dutch adit reconnaissance was carriedout and relevant coordinate data were recorded.
The No.3 drill corestores has been repaired and 21 groups of cores have been sorted out forverification. According to the detailed inspection report, we have checked 16groups, including ZK205 and ZK203.